Abrasive Blasting (Chamber or Booth)

$69.95
$37.50

The Abrasive Blasting (Chamber or Booth) Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the use of dry air powered abrasive blasting equipment used in abrasive blasting chambers or booths for the surface preparation of larger items that cannot be treated in an abrasive blasting cabinet.

The SWMS provides details of the control measures required to protect workers from exposure to these hazards and risks.