Bobcat (Skid Steer Loader)

$69.95
$37.50

The Bobcat (Skid Steer Loader) Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of rubber-tyred skid steer loaders.

The SWMS provides details of qualifications required by operators, the safety inspections required of the plant before use, and the safety precautions to be observed when using a Bobcat to move spoil and fill and to operate attachments provided for the machine.