Boom Lift

$69.95
$37.50

The Boom Lift Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of mobile elevated work platforms (EWP) used for access to work carried out at heights.

The SWMS provides details of qualifications required by operators, the safety inspections required of the plant before use, and the safety precautions to be observed when using a boom lift to carry out work at heights.