Brick Conveyor

$69.95
$37.50

The Brick Conveyor Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of brick conveyors and elevators to raise bricks and blocks, etc. to levels above ground level.

The SWMS provides details of the safety inspections required of the plant before use, and the safety precautions to be observed when using a brick conveyor to raise bricks and blocks etc. to higher levels for laying.