Concrete Box Culverts

$69.95
$37.50

The Concrete Box Culverts Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the handling and placement of pre-cast concrete box culvert sections, including risks of falls and falling objects, the collapse or cave-in of excavations. and from the use of plant.

The SWMS provides details of the qualifications and competencies required where plant is used to place box culvert sections in position and the safety precautions (including personal protective equipment requirements) to be observed when constructing concrete culverts.