Demolition Hammer

$69.95
$37.50

The Demolition Hammer Safe Work Method Statement (SWMS) outlines the main hazards, risks and controls associated with the use of electric and petrol powered demolition hammers used in demolition, construction and industrial workplaces to break material such as concrete, brick and masonry, and other non-metallic construction materials.

The SWMS provides details of the inspections to be carried out before the tool is used and the safety precautions to be observed when using demolition hammers.