Demolition - Minor Structures

$69.95
$37.50

The Demolition – Minor Structures Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the demolition of minor structures that are either separate from or attached to, but do not form part of the load-bearing structure of a building, and that does not require notification or a demolition licence to carry out the work.

The SWMS provides details of the health and safety precautions (including protective equipment) required for the demolition of minor structures.