Demolition Saw

$69.95
$37.50

The Demolition Saw Safe Work Method Statement (SWMS) outlines the main hazards, risks and controls associated with the use of fibre wheels used in demolition, construction and industrial workplaces to cut material such as steel sections, concrete and masonry, and reinforcing steel.

The SWMS provides details of the inspections to be carried out before the saw is used and the safety precautions to be observed when using demolition saws.