Demolition - Non-structural

$69.95
$37.50

The Demolition – Non-structural Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the demolition of non-structural internal components of a building (e.g., non-load bearing partitions, etc.), including risks of falls, hazardous manual tasks, and exposure to hazardous materials.

The SWMS provides details of the health and safety precautions (including personal protection) required when carrying out non-structural demolition work.