Directional Drilling

$69.95
$37.50

The Directional Drilling Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of directional drilling machines used on sites.

The SWMS provides details of safety precautions required for work sites, the inspections required of the plant before use, and the safety precautions to be observed when using directional drilling equipment on sites.