Excavator

$69.95
$37.50

The Excavator Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of tracked excavators used on sites.

The SWMS provides details of qualifications required by operators, the safety inspections required of the plant before use, and the safety precautions to be observed when using excavators to excavate trenches and excavations on sites.