Fencing- Post and Panel

$69.95
$37.50

The Fencing – Post and Panel Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the erection of steel tube fence posts and attachment of metal or wire panel infills including use of mobile plant, power tools, hazardous manual tasks, working in outdoor conditions, and use of hazardous chemicals.

The SWMS provides details of the health and safety precautions (including personal protection) required in the erection of metal post and panel fencing.