Flexible Drive Pump

$69.95
$37.50

The Flexible Drive Pump Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of flexible drive pumps used for dewatering purposes on sites, pump out of pits and sumps, and for filling of water tankers.

The SWMS provides details of the safety inspections required of the plant before use, and the safety precautions to be observed when using flexible drive pumps.