Floor Grinder

$69.95
$37.50

The Floor Grinder Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of floor grinders used for surface preparation of concrete floors prior to the application of coatings or coverings.

The SWMS provides details of the safety inspections required of the plant before use, and the safety precautions (including personal protective equipment requirements) to be observed when using floor grinders.