Flooring

$69.95
$37.50

The Flooring Work Method Statement (SWMS) outlines the main hazards and risks associated with the preparation of floor surfaces and installation of flooring in commercial or residential premises.

The SWMS provides details of the health and safety precautions (including personal protective equipment) to be observed when preparing surfaces and laying flooring.