Garage Door Opener (Sectional and Tilt Doors)

$69.95
$37.50

The Garage Door Opener (Sectional and Tilt Doors) Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the installation of electrically-powered garage door openers fitted to sectional and tilting garage doors, including hazardous manual tasks, risk of falls, electrical hazards, and use of power tools.

The SWMS provides details of the health and safety precautions (including protective equipment) necessary when installing powered openers to sectional and tilt garage doors.