Illuminated Signs

$69.95
$37.50

The Illuminated Signs Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the installation of illuminated signs including risk of falls when working at heights, traffic hazards, hazardous manual tasks, electrical hazards and exposure to hazardous chemicals.

The SWMS provides details of the health and safety precautions to be observed (including protective equipment) to be observed when installing illuminated signs.