Insulation (Batts)

$69.95
$37.50

The Insulation (Batts) Safe Work Method Statement (SWMS) outlines the main hazards and risks including the risk of falls and hazardous manual tasks associated with the installation of insulation batts.

The SWMS provides details of the health and safety precautions (including requirements for safe working at heights) to be observed when installing insulation in residential batts.