Mobile Crane - Slewing

$69.95
$37.50

The Mobile Crane – Slewing Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of slewing mobile cranes used to lift and lower loads in workplaces, including the risk of falls, electrical hazards, movement of powered mobile plant, traffic hazards, hazardous manual tasks, and risks to other persons.

The SWMS outlines the health and safety precautions (including protective equipment) to be followed when operating and maintaining slewing mobile cranes.