Pallet Racking - Installation

$69.95
$37.50

The Pallet Racking – Installation Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the site preparation and installation of pallet racking systems including working at heights, risks of falls, use of chemicals, use of loadshifting plant and height access equipment, and hazardous manual tasks.

The SWMS provides details of the health and safety precautions (including personal protection) to be followed when installing pallet racking.