Pool Fencing- Post and Panel

$69.95
$37.50

The Pool Fencing – Post and Panel Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the erection of steel tube fence posts and attachment of tubular metal panel infills including use of power tools, hazardous manual tasks, working in outdoor conditions, and use of hazardous chemicals.

The SWMS provides details of the health and safety precautions (including personal protection) required in the erection of metal post and panel pool fencing.