Post Hole Auger (Hand-held)

$69.95
$37.50

The Post Hole Auger (Hand-held) Safe Work Method Statement (SWMS) outlines the main hazards, risks and controls associated with the use of motorised hand-held post hole augers used to excavate shallow holes for the erection of fence posts, sign posts, and planting of trees, etc.

The SWMS provides details of the inspections to be carried out before the auger is used and the safety precautions to be observed when motorised post hole augers.