Sliding Gate (Installation)

$69.95
$37.50

The Sliding Gate (Installation) Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the installation of sliding gate systems including hazardous manual tasks, falling objects, hazardous substances, outdoor work and mobile plant. The SWMS does not cover the installation of opening systems.

The SWMS provides details of the health and safety precautions (including personal protection) required when fitting sliding gate systems.