Stone Bench Tops

$69.95
$37.50

The Stone Bench Tops Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the fabrication and installation of stone bench tops, including hazardous manual tasks, exposure to hazardous chemicals and dusts, use of electrical tools and equipment, falling objects and noise.

The SWS provides details of the health and safety precautions including protective clothing and PPE) required when installing stone bench tops.