Sub-floor Preparation

$69.95
$37.50

The Sub-floor Preparation Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the preparation of floors for the installation of flooring and floor covering, including hazardous manual tasks, use of floor preparation plant and equipment, exposure to hazardous chemicals, noise an dust, and risks of falls.

The SWMS provides details of the health and safety precautions (including protective clothing and PPE) required to carry out sub-floor preparation.