Demolition - Domestic Structures

$69.95
$37.50

The Demolition – Domestic Structures Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the demolition of domestic dwellings including movement of powered mobile plant, risk of falls, exposure to hazardous materials, falling objects and work in outdoor conditions.

The SWMS provides details of the health and safety precautions (including protective equipment) required for the demolition of domestic houses.