Drop Saw

$69.95
$37.50

The Drop Saw Safe Work Method Statement (SWMS) outlines the main hazards, risks and controls associated with the use of drop saws used in construction and industrial workplaces to cut timber used in framing, roof trusses, etc.

The SWMS provides details of the inspections to be carried out before the saw is used and the safety precautions to be observed when using drop saws.