Floor Polisher

$69.95
$37.50

The Floor Polisher Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of floor polishers used for the polishing of timber or vinyl floor surfaces.

The SWMS provides details of the safety inspections required of the plant before use, and the safety precautions (including personal protective equipment requirements) to be observed when using floor polishers.