Floor Tiles

$69.95
$37.50

The Floor Tiles Work Method Statement (SWMS) outlines the main hazards and risks associated with the preparation of floor surfaces and installation of ceramic, stone and terracotta floor tiles in commercial or residential premises.

The SWMS provides details of the health and safety precautions (including personal protective equipment requirements) to be observed when preparing floor surfaces and laying floor tiles.