Tile Elevator

$69.95
$37.50

The Tile Elevator Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the operation of tile elevators to raise tiles and accessories, etc. to roof level.

The SWMS provides details of the safety inspections required of the plant before use, and the safety precautions to be observed when using a tile elevator to raise tiles etc. to higher levels for installation.