Timber Doors and Windows (Installation)

$69.95
$37.50

The Timber Doors and Windows Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the installation of pre-manufactured timber and glass doors and windows including hazardous manual tasks, use of chemicals and materials, and risks of falls.

The SWMS provides details of the safety precautions (including protective clothing and PPE) required when installing timber doors and windows.