Timber Doors and Windows (Manufacture)

$69.95
$37.50

The Timber Doors and Windows (Manufacture) Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the manufacture of timber-framed doors and windows including operation of mobile plant, hazardous manual tasks, operation of machinery, noise, dust, and exposure to hazardous chemicals.

The SWMS provides details of the health and safety precautions (including protective clothing and equipment) necessary during the manufacturing of timber doors and windows.