Timber Flooring (Glued)

$69.95
$37.50

The Timber Flooring (Glued) Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with work carried out when preparing for and laying timber flooring using the adhesive method, including risks of falls and the likelihood of exposure to hazardous manual tasks.

The SWMS provides details of the health and safety precautions (including personal protective equipment requirements) to be observed when laying timber flooring in residential and commercial premises.