Transport of Small Plant on Trailers

$69.95
$37.50

The Transport of Small Plant on Trailers Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the loading and unloading small plant (e.g., bobcats, mini-excavators, etc.) on to and from trailers attached to trucks, including work on or near traffic corridors, operation of mobile plant, and hazardous manual tasks.

The SWMS provides details of the health and safety precautions (including personal protection) required when loading and unloading small plant on to and from trailers.