Trucks and Trailers -Loading and Unloading

$69.95
$37.50

The Trucks and Trailers – Loading and Unloading Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the loading and unloading of trucks and trailers used in the general transport and logistics industry, including work on or near traffic corridors, operation of mobile plant, and hazardous manual tasks.

The SWMS provides details of the health and safety precautions (including personal protection) required when loading and unloading trucks and trailers.