Wall Tiles

$69.95
$37.50

The Wall Tiles Work Method Statement (SWMS) outlines the main hazards and risks including hazardous manual tasks and exposure to chemicals associated with the preparation of wall surfaces and installation of ceramic wall tiles in commercial or residential premises.

The SWMS provides details of the health and safety precautions (including personal protective equipment requirements) to be observed when preparing wall surfaces and fixing ceramic wall tiles.