Water Meter Replacement (Domestic)

$69.95
$37.50

The Water Meter Replacement Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with installation or replacement of water meters in domestic and smaller commercial and industrial premises including hazardous manual tasks, working near traffic ways, and risk of exposure to solar UV radiation and extremes of weather.

The SWMS provides details of the health and safety precautions (including personal protective equipment requirements) to be observed when installing or replacing water meters.