Sub-floor Preparation

SKU:SWMS0190
$ 37.50
Base price for variant $ 45.00
Sales price without tax $ 37.50
Discount -$ 7.50
Price / kg:

Description

The Sub-floor Preparation Safe Work Method Statement (SWMS) outlines the main hazards and risks associated with the preparation of floors for the installation of flooring and floor covering, including hazardous manual tasks, use of floor preparation plant and equipment, exposure to hazardous chemicals, noise an dust, and risks of falls.

The SWMS provides details of the health and safety precautions (including protective clothing and PPE) required to carry out sub-floor preparation.

Reviews

There are yet no reviews for this product.
 x 
Cart (
Empty
)

Cart

Your shopping cart is empty

 x 
Cart (
Empty
)

Cart

Your shopping cart is empty

Safe Work Method Statements
(A division of the ASSA Group)
Phone 1300 131 014
Unit 33A Success Street Acacia Ridge QLD
ABN: 98 1319 710 54
COPYRIGHT © ASSA GROUP PTY LTD